Lower Poplar Water Reclamation Facility Influent Pump Station Improvements
Date Created: July 11, 2024
Deadline: August 27, 2024 2:00 pm
Bid #: 51ISP2-IMP-1
Bid Type: Construction
Associated Documents:
- Invitation to Bid
- Contract Documents and Specifications
- Plan Drawings
- Plan Holders List
- Pre-Bid Conference Attendance 8/6/2024
- Bid Opening Meeting Room Change Notification
- Addendum No 1
- Addendum No 2
- Addendum No 3
- Addendum No 4 - Addendum Narrative
- Addendum No 4 - EcoTech - Valve and Actuator Procurement Contract Documents
- Addendum No 4 - Kazmier - Flow Meter Procurement Contract Documents
- Addendum No 4 - MR Systems SCADA Proposal
- Addendum No 4 - Wesco - eHouse Buildings Procurement Contract Documents (1)
- Addendum No 4 - Xylem - Submersible Pumps and VFDs Procurement Contract Documents
- Addendum No 5
Description
The Project consists of improvements to convert the existing wet well / dry pit pump station into a submersible pump station with six (6) new variable speed submersible wastewater pumps and appurtenances. Four of the pumps will be high-flow pumps, and two will be low-flow pumps to match off-peak duty flow conditions. Isolation valves will be installed on the two pump station effluent force mains. Two magnetic flow meters will be installed in a concrete vault on the force mains. The existing Electrical Building will be demolished, and two prefabricated electrical buildings (eHouses) will be provided to house the variable frequency drives (VFDs), electrical distribution, motor control equipment, and SCADA controls with temperature and humidity control. The Owner is proceeding with early procurement of the new pumps, VFDs, plug valves and actuators, flow meters, and eHouses, to be included in the Contract as Allowance items.
The Project will be awarded in one Contract. Fifty-one percent (51%) of the Work under the Contract Documents must be self-performed by the General Contractor. The Project will be awarded by base bid on a lump sum basis for the performance and completion of all Work required by the Contract Documents.
THE INVITATION TO BID FORM BELOW CANNOT BE USED FOR THIS BID. PLEASE REFER TO THE PLAN DOCUMENTS UNDER SECTION 0100-INSTRUCTION TO BIDDERS. A BID SUBMITTED THROUGH THE FORM BELOW WILL NOT BE ACCEPTED.
Project Phase
- Phase 1
- Phase 2
- Phase 3
- Phase 4
- Phase 5