Construction Bids
Rocky Creek WRF Admin Replace Roof and Wall Repair
The Project consists of roof removal and replacement on the Administration Building and the Post Aeration Building at Rocky Creek Water Reclamation Facility. Both buildings’ existing roofs consist of a single ply recover over an aggregate surfaced BUR. The existing roofs will be removed down to the existing concrete decks.…
View BidRocky Creek Water Reclamation Facility Perimeter Fence Install
The Project consists of clearing, removing vegetation, and installing a perimeter fence around the Rocky Creek Water Reclamation Facility, including the newly acquired adjacent 19-acre parcel and other areas not currently fenced in for security purposes, as detailed in these Specifications. Exhibit A provides an overview of the fencing plan,…
View BidOhara Drive North 4-Inch Force Main Replacement
The Project consists of installing approximately 690 LF of 4-inch DR 9 DIPS HDPE Sanitary Sewer Force Main by Open Trench and Jack and Bore methods. Pipe material to be furnished by the Macon Water Authority. THE INVITATION TO BID FORM BELOW CANNOT BE USED FOR THIS BID. PLEASE…
View BidMowing and Trimming Project
The Project consists of mowing and trimming within the mowing limits at Amerson Water Treatment Plant, Lower Poplar Water Reclamation Facility, and Rocky Creek Water Reclamation Facility in a safe, effective, and timely manner, as stated in the Specifications contained in the contract documents. The contract time will be twelve…
View BidI-16/I-75 Phase 6 Force Main
This bid has closed.
The Project consists of installing approximately 2,035 LF of 24” DIPS DR 9 HDPE Sanitary Sewer Force Main by Open Trench and Aerial installation for Phase 6 of the I-16/I-75…
View Bid