The Macon Water Authority
790 Second Street • Macon, GA 31202-0108 • (478) 464-5600
Projects Under Construction
After projects are awarded and contracts completed, the MWA staff hosts a pre-construction meeting with the awarded contractor(s). Normally, a "Notice to Proceed" (NTP) is delivered at this meeting. The project start and end date are posted in the NTP as well. At this point, the project is under construction and continues until the project is accepted by the MWA as completed. Current projects under construction are divided into three areas:
1) Facilities
2) Water System, and
3) Sewer System
By selecting the link below, a list of the projects for each area and a brief progress report for each can be viewed.



