AWTP-(2) 1000 Hp Reservoir Vertical Turbine
Date Created: October 2, 2026
Deadline: November 17, 2026 2:00 pm
Bid #: 40RESV-TURB-26
Bid Type: Motor Replacement
Associated Documents:
- Invitation to Bid
- Contract Documents
- Driving Directions to the Pre-Bid Location - Admin Building at Amerson WTP
Description
The Project consists of furnishing all labor, materials, equipment, tools and incidentals required for the installation (replacement) of two (2) 1000 HP motors at the Amerson Water Treatment Plant (AWTP) Reservoir Pump Station. Winning bidder must provide, install and laser-align the motors. Installation will include providing a crane, removing and replacing the pump house roof, existing motor removal and transport to on-site storage location, providing provisions for vibration detectors 90 degrees apart with ¼-28 UNF tapped hole to mount our sensors, providing (and laser aligning shafts) a new coupling for each unit, making all electrical disconnections and reconnections, installing a vibration system (and ensuring proper operation), performing vibration analysis before and after new motor installation, and all other tasks, requirements, and specifications outlined in the contract documents.
Please be advised that the official contract documents and drawings for the upcoming project are now available for purchase. Interested contractors can purchase documents directly through our secure Invoice Cloud Portal. Click on the link below and choose Engineering Cloud Stores > Contract Document Purchase. Please make note of the Bid Number above as you will need it for your purchase.
https://www.invoicecloud.com/portal/(S(kun0q2biodv0ylnsatajvpg0))/2/Site.aspx?G=26c042e6-b9c0-4f27-a2eb-bd5e1322d702
THE INVITATION TO BID FORM BELOW CANNOT BE USED FOR THIS BID. PLEASE REFER TO THE PLAN DOCUMENS UNDER SCTION 0100-INSTRUCTIONS TO BIDDERS. A BID SUBMITTED THORUGH THE FORM BELOW WILL NOT BE ACCEPTED.
Project Phase
- Phase 1
- Phase 2
- Phase 3
- Phase 4
- Phase 5