Rocky Creek WRF Maintenance Building Replace Roof

The Project consists of roof removal and replacement on the Maintenance Building at Rocky Creek Water Reclamation Facility. The existing roof consist of a single ply recover over an aggregate surfaced built-up-roof (BUR) over lightweight concrete (LWC) which is over a precast double T concrete deck. The existing roofs and…

View Bid

Structural Repairs at Amerson WTP

The Project consists of exterior and interior building repairs to address water infiltration, concrete deterioration, and structural settlement at the facility. Work includes removal of debris and vegetation at slab…

View Bid
A collage of three photos shows a brick building with a green downspout, patchy grass, concrete, and cloudy sky.

Rocky Creek WRF Admin Replace Roof and Wall Repair

The Project consists of roof removal and replacement on the Administration Building and the Post Aeration Building at Rocky Creek Water Reclamation Facility. Both buildings’ existing roofs consist of a single ply recover over an aggregate surfaced BUR. The existing roofs will be removed down to the existing concrete decks.…

View Bid

Rocky Creek Water Reclamation Facility Perimeter Fence Install

The Project consists of clearing, removing vegetation, and installing a perimeter fence around the Rocky Creek Water Reclamation Facility, including the newly acquired adjacent 19-acre parcel and other areas not currently fenced in for security purposes, as detailed in these Specifications. Exhibit A provides an overview of the fencing plan,…

View Bid

Ohara Drive North 4-Inch Force Main Replacement

The Project consists of installing approximately 690 LF of 4-inch DR 9 DIPS HDPE Sanitary Sewer Force Main by Open Trench and Jack and Bore methods. Pipe material to be furnished by the Macon Water Authority.   THE INVITATION TO BID FORM BELOW CANNOT BE USED FOR THIS BID. PLEASE…

View Bid
1 2 3 4